Scientific Studies and Research - Specified Projects and Implementation. Special Application and Proportion. Malaysian Perspective and Future Projection. Specific Engineering Methods and Simplified FIndings.
Ads.1
Friday, 23 August 2013
Hospital Shah Alam siap tahun depan - Menteri
BLOG ABG
Tuesday, 20 August 2013
Secara Teknikal Selangor Akan Mengahadapi Masalah Kritikal Menjelang 2015
Menteri Besar Tan Sri Abdul Khalid Ibrahim berkata bahawa Selangor tidak mengalami krisis air dengan rizab kritikal dua peratus seperti yang didakwa syarikat itu sebelum ini adalah agak meragukan kita kerana;-
1. Banyak spekulasi telah dibuat mengenai isu air di Selangor.
2. Ada yang mengatakan bahawa benar, sedang berlaku satu krisis air yang agak kritikal. Ada juga yang mengatakan bahawa ia cuma satu permainan politik untuk menggagalkan kerajaan negeri Selangor di bawah pimpinan TS Khalid Ibrahim.
3. Tetapi setelah mendengar sendiri penjelasan yang dibuat oleh pihak Puncak Niaga dan lawatan ke Loji Rawatan Air Sungai Langat di Batu 10, Hulu Langat, banyak pencerahan dapat dibuat dan dikenal pasti.
Latar Belakang
4. Loji Rawatan Air Sungai Langat beroperasi di bawah seliaan Puncak Niaga.
5. Mereka memproses air mentah untuk dijadikan air terawat supaya boleh digunakan oleh orang ramai.
6. Air yang diproses akhirnya akan dijual kepada pihak Syabas. Syabas pula akan menyalurkan air ini kepada isi rumah di kawasan-kawasan tertentu.
7. Loji Rawatan Air Sungai Langat memproses air untuk dibekalkan kepada kawasan Selatan Selangor termasuk Kuala Lumpur.
8. Loji ini secara rekabentuknya mampu memproses 386 MG (million gallon) setiap hari. Tetapi kini beroperasi sehingga 460-470 MG setiap hari, bermakna loji ini beroperasi pada tahap 121% keupayaan.
Krisis Air
9. Krisis air ini berlaku apabila loji ini tidak dapat memenuhi permintaan pengguna atas dasar kapasiti sudah mencapai tahap maksima.
10. Dengan pertumbuhan ekonomi negara yang semakin pesat ini juga menyebabkan kadar penggunaan air bertambah dari masa ke semasa
11. Kadar pertambahan penduduk menyebabkan kadar penggunaan air juga bertambah.
12. Dengan kapasiti yang sedia ada, penggunaan air semakin tinggi tetapi prasarana masih pada keadaan 3, 4 tahun yang lampau.
13. Antara tugas Syabas adalah untuk menasihatkan kerajaan negeri tentang krisis air 3 TAHUN sebelum berlakunya krisis tersebut.
14. Permohonan telah dibuat oleh Syabas dan sudahpun diluluskan oleh kerajaan pusat tetapi belum diluluskan oleh kerajaan negeri sehingga kini. Untuk membolehkan loji baru dibina memerlukan persetujuan daripada kerajaan negeri.
Menjawab Spekulasi
Kenyataan I :
“Air di empangan tinggi, mana ada masalah air!”
Jawapan :
Air di empangan memang tinggi, tetapi masalah bukan bekalan air mentah, tetapi air terawat. Analogi mudah; sebuah ladang lembu mempunyai 5,000 ekor lembu tetapi tukang sembelihnya hanya ada seorang. Kemampuan untuk mengeluarkan daging ke pasaran terletak kepada tukang sembelih dan bukannya berapa banyak lembu yang ada.
Kenyataan II :
“Sepanjang tahun hujan, bekalan air mesti mencukupi!”
Jawapan :
Sekali lagi jawapan adalah sama seperti sebelumnya iaitu masalah bekalan air terawat. Dan tambahan lagi, sekiranya hujan lebat, loji tidak akan mampu memproses air tersebut kerana faktor kekeruhan yang tinggi. Pam loji akan rosak kerana kandungan lumpur yang terlalu tinggi untuk diproses sehingga memaksa loji perlu ditutup.
Kenyataan III :
“Kita akan menggunakan air lombong!”
Jawapan :
Masih lagi jawapan yang sama! Air lombong sekalipun, air tersebut perlu dirawat terlebih dahulu dan perlukan loji untuk merawat.
Kenyataan IV :
“Syabas menangguhkan bayaran kepada loji sebanyak RM 2 billion untuk mencipta krisis air!”
Jawapan :
Loji ini sudahpun beroperasi pada tahap 121%. Dan semua air yang diproses dijual terus kepada Syabas. Tangki 4 iaitu di Balakong yang boleh memuatkan 4 MG habis digunakan. Apabila air di tangki tersebut sudah mencapai tahap 3-4 inci ataupun setinggi buku lali, tangki tersebut tidak lagi mempunyai tekanan yang cukup untuk menyalurkan air ke isi rumah. Setiap kali air sampai ke tangki 4 ini, habis terus digunakan.
Kenyataan V :
“Kerajaan BN berpakat dengan Syabas untuk tutup bekalan air untuk mencipta krisis air!”
Jawapan :
Sekiranya benar, maka loji air tersebut tidak perlu untuk memproses air pada tahap 121% keupayaan. Loji-loji air yang sedia ada sudahpun beroperasi lebih daripada kadar yang sepatutnya. Jika benar Syabas tutup bekalan air, maka melimpah-limpahlah air di setiap tangki simpanan air yang ada di seluruh Selangor.
Penyelesaian :
1. Cara penyelesaian yang terbaik adalah dengan membina lebih banyak loji-loji rawatan air si sekitar Selangor.
2. Syabas sudahpun menasihatkan kerajaan negeri 3 tahun yang lalu tentang krisis air yang akan berlaku.
3. Loji Rawatan Air Langat 2 tidak perlu dipolitikkan oleh PKR dan perlu dibina segera untuk menyelesaikan masalah rakyat. Pentingkan rakyat dan bukannya politik parti sahaja.
4. TS Khalid Ibrahim dan Exco Kerajaan Negeri Selangor perlu faham dengan jelas krisis air yang dihadapi dan bukannya bercakap dengan sembrono sahaja.
5. Mengikut pandangan profesional dari Puncak Niaga sendiri, sekiranya keadaan ini tidak berubah dan tiada tindakan selanjutnya diambil, Selangor secara keseluruhannya akan mengalami masalah krisis air ini dalam tempoh 10-12 bulan lagi.
6. Masalah bukan tentang air banyak di empangan, tetapi air terawat yang dikeluarkan oleh loji.
1. Banyak spekulasi telah dibuat mengenai isu air di Selangor.
2. Ada yang mengatakan bahawa benar, sedang berlaku satu krisis air yang agak kritikal. Ada juga yang mengatakan bahawa ia cuma satu permainan politik untuk menggagalkan kerajaan negeri Selangor di bawah pimpinan TS Khalid Ibrahim.
3. Tetapi setelah mendengar sendiri penjelasan yang dibuat oleh pihak Puncak Niaga dan lawatan ke Loji Rawatan Air Sungai Langat di Batu 10, Hulu Langat, banyak pencerahan dapat dibuat dan dikenal pasti.
Latar Belakang
4. Loji Rawatan Air Sungai Langat beroperasi di bawah seliaan Puncak Niaga.
5. Mereka memproses air mentah untuk dijadikan air terawat supaya boleh digunakan oleh orang ramai.
6. Air yang diproses akhirnya akan dijual kepada pihak Syabas. Syabas pula akan menyalurkan air ini kepada isi rumah di kawasan-kawasan tertentu.
7. Loji Rawatan Air Sungai Langat memproses air untuk dibekalkan kepada kawasan Selatan Selangor termasuk Kuala Lumpur.
8. Loji ini secara rekabentuknya mampu memproses 386 MG (million gallon) setiap hari. Tetapi kini beroperasi sehingga 460-470 MG setiap hari, bermakna loji ini beroperasi pada tahap 121% keupayaan.
Krisis Air
9. Krisis air ini berlaku apabila loji ini tidak dapat memenuhi permintaan pengguna atas dasar kapasiti sudah mencapai tahap maksima.
10. Dengan pertumbuhan ekonomi negara yang semakin pesat ini juga menyebabkan kadar penggunaan air bertambah dari masa ke semasa
11. Kadar pertambahan penduduk menyebabkan kadar penggunaan air juga bertambah.
12. Dengan kapasiti yang sedia ada, penggunaan air semakin tinggi tetapi prasarana masih pada keadaan 3, 4 tahun yang lampau.
13. Antara tugas Syabas adalah untuk menasihatkan kerajaan negeri tentang krisis air 3 TAHUN sebelum berlakunya krisis tersebut.
14. Permohonan telah dibuat oleh Syabas dan sudahpun diluluskan oleh kerajaan pusat tetapi belum diluluskan oleh kerajaan negeri sehingga kini. Untuk membolehkan loji baru dibina memerlukan persetujuan daripada kerajaan negeri.
Menjawab Spekulasi
Kenyataan I :
“Air di empangan tinggi, mana ada masalah air!”
Jawapan :
Air di empangan memang tinggi, tetapi masalah bukan bekalan air mentah, tetapi air terawat. Analogi mudah; sebuah ladang lembu mempunyai 5,000 ekor lembu tetapi tukang sembelihnya hanya ada seorang. Kemampuan untuk mengeluarkan daging ke pasaran terletak kepada tukang sembelih dan bukannya berapa banyak lembu yang ada.
Kenyataan II :
“Sepanjang tahun hujan, bekalan air mesti mencukupi!”
Jawapan :
Sekali lagi jawapan adalah sama seperti sebelumnya iaitu masalah bekalan air terawat. Dan tambahan lagi, sekiranya hujan lebat, loji tidak akan mampu memproses air tersebut kerana faktor kekeruhan yang tinggi. Pam loji akan rosak kerana kandungan lumpur yang terlalu tinggi untuk diproses sehingga memaksa loji perlu ditutup.
Kenyataan III :
“Kita akan menggunakan air lombong!”
Jawapan :
Masih lagi jawapan yang sama! Air lombong sekalipun, air tersebut perlu dirawat terlebih dahulu dan perlukan loji untuk merawat.
Kenyataan IV :
“Syabas menangguhkan bayaran kepada loji sebanyak RM 2 billion untuk mencipta krisis air!”
Jawapan :
Loji ini sudahpun beroperasi pada tahap 121%. Dan semua air yang diproses dijual terus kepada Syabas. Tangki 4 iaitu di Balakong yang boleh memuatkan 4 MG habis digunakan. Apabila air di tangki tersebut sudah mencapai tahap 3-4 inci ataupun setinggi buku lali, tangki tersebut tidak lagi mempunyai tekanan yang cukup untuk menyalurkan air ke isi rumah. Setiap kali air sampai ke tangki 4 ini, habis terus digunakan.
Kenyataan V :
“Kerajaan BN berpakat dengan Syabas untuk tutup bekalan air untuk mencipta krisis air!”
Jawapan :
Sekiranya benar, maka loji air tersebut tidak perlu untuk memproses air pada tahap 121% keupayaan. Loji-loji air yang sedia ada sudahpun beroperasi lebih daripada kadar yang sepatutnya. Jika benar Syabas tutup bekalan air, maka melimpah-limpahlah air di setiap tangki simpanan air yang ada di seluruh Selangor.
Penyelesaian :
1. Cara penyelesaian yang terbaik adalah dengan membina lebih banyak loji-loji rawatan air si sekitar Selangor.
2. Syabas sudahpun menasihatkan kerajaan negeri 3 tahun yang lalu tentang krisis air yang akan berlaku.
3. Loji Rawatan Air Langat 2 tidak perlu dipolitikkan oleh PKR dan perlu dibina segera untuk menyelesaikan masalah rakyat. Pentingkan rakyat dan bukannya politik parti sahaja.
4. TS Khalid Ibrahim dan Exco Kerajaan Negeri Selangor perlu faham dengan jelas krisis air yang dihadapi dan bukannya bercakap dengan sembrono sahaja.
5. Mengikut pandangan profesional dari Puncak Niaga sendiri, sekiranya keadaan ini tidak berubah dan tiada tindakan selanjutnya diambil, Selangor secara keseluruhannya akan mengalami masalah krisis air ini dalam tempoh 10-12 bulan lagi.
6. Masalah bukan tentang air banyak di empangan, tetapi air terawat yang dikeluarkan oleh loji.
1hwe
Wednesday, 19 June 2013
DIANA Analysis of a Concrete Faced Rockfill Dam
DIANA Analysis of a Concrete Faced Rockfill Dam
Type In proceedings
Author Gerd-Jan Schreppers, Giovanna Lilliu
Year 2009 - 10th Benchmark Workshop on Numerical Analysis of Dams, ICOLD
Keywords CFRD, Cracking, 3D
Abstract
Several concrete faced rockfill dams in the world present cracks in the concrete face. In this paper the authors make an attempt to predict formation of cracks in one of such dams, the Mohale dam in Lesotho, South Africa. Foundation of the dam, dam body and the concrete slab are modelled in 3D. A Cam-clay plasticity model with hardening is adopted for the rockfill. Contact bewteen the concrete face and rockfill is modelled with contact elements, with a Coulomb friction material constitutive model. Interface elements are used to model the vertical joints among the 37 panels that form the concrete face. For the concrete face a total strain crack model in combination with crushing is adopted. In the analysis the different construction stages have been considered, as well as the different impoundment stages. The results shown in this paper are displacement and stresses in the rockfill and the concrete face, crack patterns and crack strains in the concrete face, and openings of the vertical joints.
1 Introduction
In CFRDs, settlements of the rockfill during and after construction can cause deformation and cracking of the concrete face. To prevent this, empirical rules have been formulated for controlling grading of the rockfill and compaction conditions. However, as higher and higher CFRDs are built in the world, numerical analysis is necessary to validate the empirical rules. Due to the complex physical mechanisms involved in the interaction of the different structural elements in a CFRD, and the need to consider 3D effects, there are not many comprehensive examples of numerical analysis of CFRDs. This has motivated the ICOLD Committee on Computational Aspects of Analysis and Design of Dams to propose the numerical analysis of a CFRD as one of the themes for the 10th Benchmark Workshop on Numerical Analysis of Dams [1]. Object of this benchmark is the Mohale dam in Lesotho, South-Africa. This is a 145 m high CFRD, with a crest length of 600 m, a concrete face surface of 73400 m2 and a total fill volume of approximately 7.5 million m3. The dam was built of basalt rockfill. After the reservoir was completely impounded, significant dam movements occurred and cracks developed in the concrete face, which caused leakage. Information provided in [1] is not sufficient for a quantitative comparison of numerical predictions and actual deformation and crack status in the Mohale dam. Nevertheless, this exercise has offered the authors the possibility to test the capability of the finite element package DIANA [2] to model the behaviour of CFRDs.
2 Modelling aspects
2.1 Finite Element Model
The finite element model of the dam body and the foundation is shown in Figure 1. The dam body is modelled with 4-node tetrahedral elements with 6 m edge size. This element size is chosen for limiting the number of degrees of freedom in the model. The total number of elements in the dam body is 184812, and the number of nodes is 36417. The foundation is modelled with 260900 elements, with 82321 nodes. The nodes at the outer and bottom surfaces of the foundation are constrained along the normal to the surface. Figure 2 shows the different construction stages of the dam body. The rock-fill phases are divided in a upstream half well-graded rockfill and a downstream half of poorly graded rockfill.
Figure 1. Finite element model of the dam body and foundation
The concrete slab is modelled with shell elements. The dam body has a complex shape, which cannot be easily meshed with a mapped mesh. For this reason, an automatic mesh generator has been used, which generates tetrahedral elements. However, quadrilateral elements are more suitable for modelling the concrete slab, as these elements account for the shear-stiffness in the slab more accurately. Furthermore, an element size smaller than 6 m is required in the concrete slab, for a more appropriate description of the failure behaviour of the slab. As a result, the quadrilateral mesh of the concrete slab, with 2.5 m element size, and the mesh of the rock fill are not compatible. Special contact elements that simulate the frictional interaction of rock fill and concrete slab are used to connect these two meshes. Line-shell interface elements between the concrete slab panels simulate the vertical joints. The concrete slab is constructed in two stages: in the first stage the concrete slab is casted up to a height of 100 m. Then a concrete beam is built at this height, for carrying paving equipment. The beam is modelled with beams elements with a cross section of 1 m2. In the second stage the slab is casted until 178 m height. The thickness of the shell elements varies from 0.30 m at the crest of the dam until 0.735 m at the foot. (1942 m). The mesh of the concrete slab is shown in Figure 3.
Figure 2. Construction stages of the dam body
Figure 3. Mesh of the concrete slab
2.2 Material properties
Settlement/load data from two experiments, respectively for poorly graded and well graded basalt were available for characterizing the material. It was assumed that the experiments were confined compression tests, and that the material follows the Cam-clay plasticity model, with exponential elastic behavior and explonential plastic hardening. The material parameters derived for the basalt are summarized in Table 1. Figure 4 compares the data from laboratory experiments with the results obtained from DIANA analysis.
Elastic harding parameter Poisson's ratio Preconsolidation stress Friction angle Plastic hardening parameter Pressure shift
Poorly Graded 0.002 0.2 0.2 MPa 30o 0.02 0.1 MPa
Well Graded 0.001 0.2 1.4 MPa 30o 0.01 0.7 MPa
Table 1. Material parameters of the basaltic rockfill
Figure 4. Calibration curves for the rockfill material
For the concrete slab a fixed total strain crack model with linear softening and Thorenfeld compressive failure is adopted. The material parameters corresponding to the C20, which were used for the concrete slab, are listed in Table 2. A higher Young's modulus has been used in order to account for the effect of steel reinforcement grids.
Young's modulus Poisson's ratio Tensile strength Compressive strength Ultimate crack strain
C20 40000 MPa 0.2 1.25 MPa 20 MPa 0.001
Table 2. Concrete material parameters
For the foundation it is assumed that this behaves linear elastically, with Young's modulus 5.0 GPa and Poisson's ratio 0.2. For the contact elements between rockfill and concrete slab cohesion and dilatancy are assumed null, and the friction angle is 400. A tensile strength of 0.5 MPa is assumed for the interface elements in the vertical joints.
2.3 Construction stages and loading
The analysis includes 16 phases. Phase 1 corresponds to the situation before construction of the dam. In this phase only the foundation element are activate elements in the analysis, and the only load considered is the own weight of the foundation. Starting from Phase 2 until Phase 6, the dam body is built as specified in Figure 2. In Phase 7, the concrete slab is casted up to a height of 100 m and the concrete beam is built. From Phase 8 until Phase 10 the construction of the dam body is completed. In Phase 11 the concrete slab is casted until the final height. From Phase 12 until Phase 16 the reservoir is impounded, and the water levels reach 85 m, 105 m, 120 m, 125 m and 138 m.
Figure 5. Results at the end of Phase 7
Figure 6. Results at the end of Phase 10
Figure 7. Results at the end of Phase 11
3 Results
The analysis was performed on a dual Intel Xeon X5550 LINUX system. The calculation time is about 3.5 hours. For sake of space, only part of the results for the analysis conducted assuming well graded rockfill and C20 concrete type are shown in this paper.
In Figure 5 are the results of Phase 7, when the first casting of the slab is completed. At the left is the geometry of the active part of the model, at the top right is the contour plot of the vertical stresses in the rock fill, at the bottom right is the crack plot in the concrete slab. But in this stage of the analysis hardly any cracks were found. The cracks are represented with discs laying on the crack surface. The different colours of the discs correspond to different crack strains. Red corresponds to a crack strain of larger then the ultimate crack strain 1•10-3, namely to a crack opening of 3.0 mm.
At the end of Phase 10, when the dam body has been completed, but only the lower half of the slab is present, cracks appear at the lateral ends of the concrete slab, as shown in Figure 6. The detail picture in the lower-right-hand of figure 6 shows the orientation of the cracks, which are mainly in vertical direction. These cracks are caused as result of the ongoing elevation of the rock-fill after the lower half of the concrete has already been put in place. As result of the ongoing elevation of the rockfill the slab is pushed downward, leading to tensile loading at the lateral ends and compressive horizontal stresses in the central part.
However, further cracking occurs in Phase 11, after the concrete slab has been completely casted, see Figure 7. In this phase the crack-strain in the lateral ends of the lower slab is reduced already (now blue, before green) as result of the load of the top-half of the slab.
In Phase 12, which corresponds to first impounding of the reservoir (water level 85 m), cracks form also at the base of the concrete slab, as consequence of the bending induced by the hydrostatic pressure.
At the end of the second impounding the water level is at the height of the concrete beam (Phase 13). In this phase a horizontal crack at the location of the beam is found, starting at the left-side of the slab and diagonal cracks parallel to the plinth in the lower slab were found. These crack patterns agree very well with observations. The principal stresses at the top-face in the slab in this stage are shown in the lower-left-hand picture of figure 8. Blue represent compressive stresses and red tensile stresses. The picture shows the high compressive stresses in lateral direction in the central part of the lower slab up to 18 MPa, where as the stresses in the upper slab are considerable lower, because the lower slab was already loaded at the time that the upper slab was constructed. The lower-right hand picture of figure 8 displays joint openings (red) and compactions (blue). In this phase the maximum joint opening is 0.5 cm.
During the sequent phases, cracks that have formed in the previous phase tend to close, and new discrete vertical cracks are initiated at the lateral ends of upper-slab when the reservoir is completely full.
Figure 8 and Figure 9 show the results in Phase 13 and Phase 16. The bottom right-hand pictures show the contour plots of the joints openings, and of their relative displacement normal to the concrete slab. Also the deformed shape of the concrete slab is shown. From the pictures of the vertical displacements the transition from well-graded rockfill (up-stream half of dam) and poorly graded rockfill (down-stream half of dam) can be recognized.
Figure 8. Results at the end of Phase 13
Figure 9. Results at the end of Phase 16
4 Conclusions
In this paper a concrete faced rockfill dam has been modeled in 3D and analyzed with the finite element package DIANA. Nonlinear compaction of the rockfill, effects of the construction stages, frictional slip between rock-fill and concrete slab, cracking and crushing of concrete, opening and out of plane slipping of the vertical joints are taken into account. The results of the numerical analysis show that the general deformation of and stresses in the dam can be well predicted with this model, as well as the most important observed crack-patterns. The analysis predicts strong lateral compaction stresses (18 MPa) in the lower half of the slab, which remain under the failure stress of 20 MPa and as a consequence the observed compressive failure in one of the central slabs was not predicted. When the compressive failure-stress of the concrete would be lower in practice then the applied value of 20 MPa, the model would be able to predict this compressive failure, leading to larger displacements and joint-openings.
References
[1] C. Marulanda and P. Anthiniac, Analysis of a Concrete Faced Rockfill Dam including Concrete Face Loading and Deformation, 10th Benchmark Workshop on Numerical Analysis of Dams, September 16-18, 2009, Paris, France. International Commission of Large Dams (ICOLD).
[2] DIANA User's Manual, Release 9.3.
1hwe
Type In proceedings
Author Gerd-Jan Schreppers, Giovanna Lilliu
Year 2009 - 10th Benchmark Workshop on Numerical Analysis of Dams, ICOLD
Keywords CFRD, Cracking, 3D
Abstract
Several concrete faced rockfill dams in the world present cracks in the concrete face. In this paper the authors make an attempt to predict formation of cracks in one of such dams, the Mohale dam in Lesotho, South Africa. Foundation of the dam, dam body and the concrete slab are modelled in 3D. A Cam-clay plasticity model with hardening is adopted for the rockfill. Contact bewteen the concrete face and rockfill is modelled with contact elements, with a Coulomb friction material constitutive model. Interface elements are used to model the vertical joints among the 37 panels that form the concrete face. For the concrete face a total strain crack model in combination with crushing is adopted. In the analysis the different construction stages have been considered, as well as the different impoundment stages. The results shown in this paper are displacement and stresses in the rockfill and the concrete face, crack patterns and crack strains in the concrete face, and openings of the vertical joints.
1 Introduction
In CFRDs, settlements of the rockfill during and after construction can cause deformation and cracking of the concrete face. To prevent this, empirical rules have been formulated for controlling grading of the rockfill and compaction conditions. However, as higher and higher CFRDs are built in the world, numerical analysis is necessary to validate the empirical rules. Due to the complex physical mechanisms involved in the interaction of the different structural elements in a CFRD, and the need to consider 3D effects, there are not many comprehensive examples of numerical analysis of CFRDs. This has motivated the ICOLD Committee on Computational Aspects of Analysis and Design of Dams to propose the numerical analysis of a CFRD as one of the themes for the 10th Benchmark Workshop on Numerical Analysis of Dams [1]. Object of this benchmark is the Mohale dam in Lesotho, South-Africa. This is a 145 m high CFRD, with a crest length of 600 m, a concrete face surface of 73400 m2 and a total fill volume of approximately 7.5 million m3. The dam was built of basalt rockfill. After the reservoir was completely impounded, significant dam movements occurred and cracks developed in the concrete face, which caused leakage. Information provided in [1] is not sufficient for a quantitative comparison of numerical predictions and actual deformation and crack status in the Mohale dam. Nevertheless, this exercise has offered the authors the possibility to test the capability of the finite element package DIANA [2] to model the behaviour of CFRDs.
2 Modelling aspects
2.1 Finite Element Model
The finite element model of the dam body and the foundation is shown in Figure 1. The dam body is modelled with 4-node tetrahedral elements with 6 m edge size. This element size is chosen for limiting the number of degrees of freedom in the model. The total number of elements in the dam body is 184812, and the number of nodes is 36417. The foundation is modelled with 260900 elements, with 82321 nodes. The nodes at the outer and bottom surfaces of the foundation are constrained along the normal to the surface. Figure 2 shows the different construction stages of the dam body. The rock-fill phases are divided in a upstream half well-graded rockfill and a downstream half of poorly graded rockfill.
Figure 1. Finite element model of the dam body and foundation
The concrete slab is modelled with shell elements. The dam body has a complex shape, which cannot be easily meshed with a mapped mesh. For this reason, an automatic mesh generator has been used, which generates tetrahedral elements. However, quadrilateral elements are more suitable for modelling the concrete slab, as these elements account for the shear-stiffness in the slab more accurately. Furthermore, an element size smaller than 6 m is required in the concrete slab, for a more appropriate description of the failure behaviour of the slab. As a result, the quadrilateral mesh of the concrete slab, with 2.5 m element size, and the mesh of the rock fill are not compatible. Special contact elements that simulate the frictional interaction of rock fill and concrete slab are used to connect these two meshes. Line-shell interface elements between the concrete slab panels simulate the vertical joints. The concrete slab is constructed in two stages: in the first stage the concrete slab is casted up to a height of 100 m. Then a concrete beam is built at this height, for carrying paving equipment. The beam is modelled with beams elements with a cross section of 1 m2. In the second stage the slab is casted until 178 m height. The thickness of the shell elements varies from 0.30 m at the crest of the dam until 0.735 m at the foot. (1942 m). The mesh of the concrete slab is shown in Figure 3.
Figure 2. Construction stages of the dam body
Figure 3. Mesh of the concrete slab
2.2 Material properties
Settlement/load data from two experiments, respectively for poorly graded and well graded basalt were available for characterizing the material. It was assumed that the experiments were confined compression tests, and that the material follows the Cam-clay plasticity model, with exponential elastic behavior and explonential plastic hardening. The material parameters derived for the basalt are summarized in Table 1. Figure 4 compares the data from laboratory experiments with the results obtained from DIANA analysis.
Elastic harding parameter Poisson's ratio Preconsolidation stress Friction angle Plastic hardening parameter Pressure shift
Poorly Graded 0.002 0.2 0.2 MPa 30o 0.02 0.1 MPa
Well Graded 0.001 0.2 1.4 MPa 30o 0.01 0.7 MPa
Table 1. Material parameters of the basaltic rockfill
Figure 4. Calibration curves for the rockfill material
For the concrete slab a fixed total strain crack model with linear softening and Thorenfeld compressive failure is adopted. The material parameters corresponding to the C20, which were used for the concrete slab, are listed in Table 2. A higher Young's modulus has been used in order to account for the effect of steel reinforcement grids.
Young's modulus Poisson's ratio Tensile strength Compressive strength Ultimate crack strain
C20 40000 MPa 0.2 1.25 MPa 20 MPa 0.001
Table 2. Concrete material parameters
For the foundation it is assumed that this behaves linear elastically, with Young's modulus 5.0 GPa and Poisson's ratio 0.2. For the contact elements between rockfill and concrete slab cohesion and dilatancy are assumed null, and the friction angle is 400. A tensile strength of 0.5 MPa is assumed for the interface elements in the vertical joints.
2.3 Construction stages and loading
The analysis includes 16 phases. Phase 1 corresponds to the situation before construction of the dam. In this phase only the foundation element are activate elements in the analysis, and the only load considered is the own weight of the foundation. Starting from Phase 2 until Phase 6, the dam body is built as specified in Figure 2. In Phase 7, the concrete slab is casted up to a height of 100 m and the concrete beam is built. From Phase 8 until Phase 10 the construction of the dam body is completed. In Phase 11 the concrete slab is casted until the final height. From Phase 12 until Phase 16 the reservoir is impounded, and the water levels reach 85 m, 105 m, 120 m, 125 m and 138 m.
Figure 5. Results at the end of Phase 7
Figure 6. Results at the end of Phase 10
Figure 7. Results at the end of Phase 11
3 Results
The analysis was performed on a dual Intel Xeon X5550 LINUX system. The calculation time is about 3.5 hours. For sake of space, only part of the results for the analysis conducted assuming well graded rockfill and C20 concrete type are shown in this paper.
In Figure 5 are the results of Phase 7, when the first casting of the slab is completed. At the left is the geometry of the active part of the model, at the top right is the contour plot of the vertical stresses in the rock fill, at the bottom right is the crack plot in the concrete slab. But in this stage of the analysis hardly any cracks were found. The cracks are represented with discs laying on the crack surface. The different colours of the discs correspond to different crack strains. Red corresponds to a crack strain of larger then the ultimate crack strain 1•10-3, namely to a crack opening of 3.0 mm.
At the end of Phase 10, when the dam body has been completed, but only the lower half of the slab is present, cracks appear at the lateral ends of the concrete slab, as shown in Figure 6. The detail picture in the lower-right-hand of figure 6 shows the orientation of the cracks, which are mainly in vertical direction. These cracks are caused as result of the ongoing elevation of the rock-fill after the lower half of the concrete has already been put in place. As result of the ongoing elevation of the rockfill the slab is pushed downward, leading to tensile loading at the lateral ends and compressive horizontal stresses in the central part.
However, further cracking occurs in Phase 11, after the concrete slab has been completely casted, see Figure 7. In this phase the crack-strain in the lateral ends of the lower slab is reduced already (now blue, before green) as result of the load of the top-half of the slab.
In Phase 12, which corresponds to first impounding of the reservoir (water level 85 m), cracks form also at the base of the concrete slab, as consequence of the bending induced by the hydrostatic pressure.
At the end of the second impounding the water level is at the height of the concrete beam (Phase 13). In this phase a horizontal crack at the location of the beam is found, starting at the left-side of the slab and diagonal cracks parallel to the plinth in the lower slab were found. These crack patterns agree very well with observations. The principal stresses at the top-face in the slab in this stage are shown in the lower-left-hand picture of figure 8. Blue represent compressive stresses and red tensile stresses. The picture shows the high compressive stresses in lateral direction in the central part of the lower slab up to 18 MPa, where as the stresses in the upper slab are considerable lower, because the lower slab was already loaded at the time that the upper slab was constructed. The lower-right hand picture of figure 8 displays joint openings (red) and compactions (blue). In this phase the maximum joint opening is 0.5 cm.
During the sequent phases, cracks that have formed in the previous phase tend to close, and new discrete vertical cracks are initiated at the lateral ends of upper-slab when the reservoir is completely full.
Figure 8 and Figure 9 show the results in Phase 13 and Phase 16. The bottom right-hand pictures show the contour plots of the joints openings, and of their relative displacement normal to the concrete slab. Also the deformed shape of the concrete slab is shown. From the pictures of the vertical displacements the transition from well-graded rockfill (up-stream half of dam) and poorly graded rockfill (down-stream half of dam) can be recognized.
Figure 8. Results at the end of Phase 13
Figure 9. Results at the end of Phase 16
4 Conclusions
In this paper a concrete faced rockfill dam has been modeled in 3D and analyzed with the finite element package DIANA. Nonlinear compaction of the rockfill, effects of the construction stages, frictional slip between rock-fill and concrete slab, cracking and crushing of concrete, opening and out of plane slipping of the vertical joints are taken into account. The results of the numerical analysis show that the general deformation of and stresses in the dam can be well predicted with this model, as well as the most important observed crack-patterns. The analysis predicts strong lateral compaction stresses (18 MPa) in the lower half of the slab, which remain under the failure stress of 20 MPa and as a consequence the observed compressive failure in one of the central slabs was not predicted. When the compressive failure-stress of the concrete would be lower in practice then the applied value of 20 MPa, the model would be able to predict this compressive failure, leading to larger displacements and joint-openings.
References
[1] C. Marulanda and P. Anthiniac, Analysis of a Concrete Faced Rockfill Dam including Concrete Face Loading and Deformation, 10th Benchmark Workshop on Numerical Analysis of Dams, September 16-18, 2009, Paris, France. International Commission of Large Dams (ICOLD).
[2] DIANA User's Manual, Release 9.3.
1hwe
Saturday, 1 June 2013
Melayu Mudah Lupa Siapa Dalang 13 Mei
Maysian History - Synopsis
Wednesday, 29 May 2013
Friday, 24 May 2013
World's Most Best Military Forces - Malaysian Armed Forces (MAF) - Angka...
Anak Kelanang
Friday, 17 May 2013
Monday, 13 May 2013
ANAKNILAI BLOGGERS GROUP (ABG): SUDAH TERANG LAGI BERSULUH : Penglibatan Asing di ...
ANAKNILAI BLOGGERS GROUP (ABG): SUDAH TERANG LAGI BERSULUH : Penglibatan Asing di ...: Malaysia: Failure of U.S. to Subvert the Elections and Install a “Proxy Regime” US "Pivot" Toward Asia Trips in Malaysia ...
1technocrate
1technocrate
1 MALAYSIA: Kaji semula kelemahan Umno-BN, kata Mahathir
1 MALAYSIA: Kaji semula kelemahan Umno-BN, kata Mahathir: KUALA LUMPUR: Umno-Barisan Nasional (BN) perlu komited mengkaji semula aspek yang menjadi punca yang melemahkan parti itu, tegas mantan P...
BLOG ABG
BLOG ABG
Wednesday, 8 May 2013
Shen Yee Aun tentang Isu Politik DAP & Cybertrooper Red Bean Army
1technocrate
Sunday, 5 May 2013
PENIPU BESAR DALAM DUNIA ADALAH ANWAR IBRAHIM - TUN M
Suara Nusantara Suara Hati Anda
Kedah Ke KL: KHAS UNTUK PENGUNDI!! Warkah Terakhir Yang Perlu D...
Kedah Ke KL: KHAS UNTUK PENGUNDI!! Warkah Terakhir Yang Perlu D...: Salam Semua, hari ni Mc agak terlewat untuk keluarkan surat DS Najib Razak, Perdana Menteri yang kita kasihi. Sebelum mengundi tu, elok ba...
1technocrate
1technocrate
Thursday, 18 April 2013
Najib Razak : Majlis Penghargaan OPS Daulat
Suara Nusantara Suara Hati Anda
SERI PUTRA: Terkini #PRU13 : MANIFESTO KHAS BN SELANGOR TAMBAT...
SERI PUTRA: Terkini #PRU13 : MANIFESTO KHAS BN SELANGOR TAMBAT...: Manifesto Khas BN Untuk Rakyat Negeri Selangor Pada PRU-13 Malah, dalam manifesto BN Selangor yang dilancarkan malam ini, BN j...
KERIS MELAYU@blogger
KERIS MELAYU@blogger
SERI PUTRA: TERKINI #PRU13 : SENARAI CALON BARISAN NASIONAL S...
SERI PUTRA: TERKINI #PRU13 : SENARAI CALON BARISAN NASIONAL S...: Calon BN Selangor: Selangor – Senarai Calon Selangor BN Yang Diumumkan Pada 16 Apr 2013 P.092 SABAK BERNAM - Mohd Fasiah Mohd Fakeh * N...
Suara Nusantara Suara Hati Anda
Suara Nusantara Suara Hati Anda
Wednesday, 17 April 2013
ANAKNILAI: TERKINI #PRU13 - PKR MEMANG KETURUNAN PENIPU !!!
ANAKNILAI: TERKINI #PRU13 - PKR MEMANG KETURUNAN PENIPU !!!: GRO PKR seronok menipu Rakyat! Ketua Srikandi PKR, Siti Aishah Shaik Ismail yang turut menjadi calon PKR Tambun semalam menyerlahkan sifat ...
KERIS MELAYU@blogger
KERIS MELAYU@blogger
Monday, 15 April 2013
Info Menarik: Model sabun Nivea promote produk dengan berbogel
Info Menarik: Model sabun Nivea promote produk dengan berbogel: Punyalah terdesak sampai macam ni dorang sanggup buat untuk melariskan perniagaan.. Akhirnya, pompuan juga yang jadi mangsa eksploitasi.. Y...
BMT
BMT
Saturday, 13 April 2013
TERIMA KASIH MALAYSIA (W/LYRICS) [HD]
Pendekar Melayu 2013
Thursday, 11 April 2013
SERI PUTRA: Malaysian opposition leader speaks to Al Jazeera
SERI PUTRA: Malaysian opposition leader speaks to Al Jazeera: INTERVIEW ALJAZEERA YANG DIBELAKANGI OLEH ZIONIS DENGAN ANWAR IBRAHIM YANG MERAPU ENTAH APA APA - MENGECOP DSAI SEBAGAI BAPA KRONISME BERSAM...
anaknilai
anaknilai
Lagu Tema PKR Dan DAP : PR OH PR
KERIS MELAYU@blogger
TepakBersulam 2: Chegu Bard dihalau macam kerbau pendek Ke Pulau Pi...
TepakBersulam 2: Chegu Bard dihalau macam kerbau pendek Ke Pulau Pi...: Hasrat TB nak bertikam lidah dengan Chegu Bard tidak kesampaian kerana Chegu Bard tidak bermain di tempat TB. Jauh lari Chegu Bard ini maca...
1hwe
1hwe
TepakBersulam 2: Siri VIII : Loke Siew Fook : Cubaan Loke Siew Foo...
TepakBersulam 2: Siri VIII : Loke Siew Fook : Cubaan Loke Siew Foo...: Cita cita tinggi Loke Siew Fook terkandas dan satu persatu cubaan beliau untuk meng"Singapore"kan Negeri Sembilan dapat dipatah...
KERIS MELAYU@blogger
KERIS MELAYU@blogger
Thursday, 4 April 2013
ANAKNILAI BLOGGERS GROUP (ABG): TERKINI #PRU13 : SELANGOR NEGERI PEMBANGKANG PER...
ANAKNILAI BLOGGERS GROUP (ABG): TERKINI #PRU13 : SELANGOR NEGERI PEMBANGKANG PER...: Di sebalik ding-dong Khalid, Selangor negeri pembangkang pertama bubar DUN Selangor menjadi negeri pertama pakatan pemba...
BantingSentral
BantingSentral
ANAKNILAI BLOGGERS GROUP (ABG): UCAPAN YAB PERDANA MENTERI DATO' SERI MOHD NAJIB T...
ANAKNILAI BLOGGERS GROUP (ABG): UCAPAN YAB PERDANA MENTERI DATO' SERI MOHD NAJIB T...: UCAPAN YAB DATO’ SRI MOHD NAJIB BIN TUN ABD RAZAK PERDANA MENTERI MALAYSIA SEMPENA PEMBUBARAN PARLIMEN KE-13 PADA 03HB APRIL 2013 --...
http://www.bernama.com/bernama/v7/bm/pdf/bubar_parlimen_2013.pdf
1Malaysa1World
http://www.bernama.com/bernama/v7/bm/pdf/bubar_parlimen_2013.pdf
1Malaysa1World
Saturday, 30 March 2013
Friday, 29 March 2013
MESEJ TERSIRAT FILEM AVATAR.
Mesej Tersirat Filem Avatar
Saya tertarik untuk mengupas mengenai isi plot filem Avatar yang begitu dipandang tinggi oleh kebanyakan pemerhati filem baik dari Barat mahupun dunia Islam. Ketika orang lain melihat kehebatan teknologi hebat Hollywood - Century Fox yang seakan berjaya menggambarkan 'syurga' kehidupan 'alien' bernama Avatar itu - dengan pemandangan seperti taman-taman tergantung yang sangat indah - saya pula melihat dengan penuh prejudis dan cuba mengenalpasti simbol-simbol 'perang' Illuminati seperti biasa.
Lebih dari itu, saya cuba kaitkan dengan filem pertama dalam plot "2012", maka akan ditemui beberapa simbol Illuminati dalam filem 3 kali ganda lebih mahal dilaburkan mereka dari plot "2012". Bagi saya, jika "2012" mereka mendedahkan impian sebenar mereka, maka "Avatar" mendedahkan kaedah mereka menuju ke arah itu.
Lebih dari itu, saya cuba kaitkan dengan filem pertama dalam plot "2012", maka akan ditemui beberapa simbol Illuminati dalam filem 3 kali ganda lebih mahal dilaburkan mereka dari plot "2012". Bagi saya, jika "2012" mereka mendedahkan impian sebenar mereka, maka "Avatar" mendedahkan kaedah mereka menuju ke arah itu.
Lukisan terkenal Michelangelo "The Sistine Chapel" di Vatican yang retak dalam "2012". Adakah benar ini gambaran Adam menyentuh tangan Tuhan atau sebenarnya gambaran alam manusia berhubungan dengan alam ghaib (syaitan) - sebagaimana digambarkan Avatar - sebagaimana juga isyarat 2 piramid bertemu membentuk logo Zionis Israel.
Israel Raya antara dua garisan biru iaitu Tigris dan Nil
Lagi penemuan saya - kepala Lucifer - membenarkan apa yang dikenalpasti oleh Rijiko :
Sumber: Rijiko
Uniform dalam filem Avatar : The five pointed Pentagram = The Eastern Star of Satanism. "The Eastern Star" is also the name of a female Masonic order by the same name, in which James Cameron's wife is a member.More of AVATAR`s Satanic Illuminati symbology expressing their afilliations to Lucifer/Satan. (tribute kepadaRijiko)
Juga link berikut dan berikut mengenai projek ala-Avatar yang telah DIWUJUDKAN sedikit demi sedikit.
The occultic meaning of the word "Avatar" is really Lucifer/Satan. The entire Movie/Entertainment industry is a well financed satanic psychological war operation being executed upon the public right before their eyes. Just like all the other Illuminati controlled industry, the Movie/Entertainment industry is a tool designed to advance their agenda of a "New World Order" and the deceptions that come along with it. In the satanic Illuminati occult dogma, the term "AVATAR" represents their coming Anti-christ, and is the Illuminati occult representation of Satan incarnate.
The Illuminati believe that through science they will be able to genetically produce a "Body" or "Host" that can then be possessed by the actual spirit of Lucifer/Satan.
This "host" that the spirit of Satan will inhabit is called the "AVATAR"
James Cameron has actually named his entire film project based around the satanic doctrines of demonic possession and modern DNA manipulation, in which the Illuminati seek to bring about the "New Age Humanoid", or demonically possessed biological human entity.
The Satanic practice of genetic merging of Animal and Human DNA.
These Illuminati funded scientists are actually genetically manufacturing nitemares such as dogs with human feet, and mice which can talk etc (lihat link berikut).
Juga link berikut dan berikut mengenai projek ala-Avatar yang telah DIWUJUDKAN sedikit demi sedikit.
"Avatar" berjaya menghantar mesej kepada penonton bahawa "makhluk asing" ciptaan mereka itu mempunyai kehidupan yang tersendiri, bahkan kehidupan mereka tampak lebih 'indah' seperti di syurga.
Sesiapa yang menyaksikan "The Arrival" sudah pasti mampu meneka mesej tersirat Illuminati melalui proksi mereka Madonna dan ramai lagi yang menggambarkan indahnya dunia syaitan dan beruntunglah mereka yang telah 'dikawal mindanya' (mind control seperti alat mesin khas "remote body" yang digunakan oleh Jake Sully dalam Avatar) sehingga mahu terus hidup di sana.
Sesiapa yang menyaksikan "The Arrival" sudah pasti mampu meneka mesej tersirat Illuminati melalui proksi mereka Madonna dan ramai lagi yang menggambarkan indahnya dunia syaitan dan beruntunglah mereka yang telah 'dikawal mindanya' (mind control seperti alat mesin khas "remote body" yang digunakan oleh Jake Sully dalam Avatar) sehingga mahu terus hidup di sana.
Majoriti filem freemasonic-director, James Cameron - selain filem terakhirnya Titanic dan True Lies - adalah bersifat "anti-human". Mereka yang tidak mengenali James Cameron dalam filemnya sebelum ini sukar untuk mengenalpasti mesej missing puzzle yang beliau sempurnakan dalam Avatar. Kenalilah James Cameron disini.
Avatar membuktikan bagaimana "alien" dicipta sebagai 'hero' dalam filem ini untuk membunuh "bad humans" yang cuba memusnahkan kehidupan semulajadi mereka. Inilah mesej dan dogma Illuminati iaitu :
Avatar membuktikan bagaimana "alien" dicipta sebagai 'hero' dalam filem ini untuk membunuh "bad humans" yang cuba memusnahkan kehidupan semulajadi mereka. Inilah mesej dan dogma Illuminati iaitu :
"humans" are a disease that is threatening all the trees and bio-life systems on earth. Therefore, according to the Illuminati, humans are to be eliminated by culling over half of this world's population to prepare for the Illuminati's version of the "NEW AGE HUMAN" (New World Order)."
Kenapa latar belakang filem-filem James Cameron berwarna biru?
Speaking of blue, one of the primary colors of the Order of the Eastern Star is the color blue and this color is literally painted all over Avatar. The color represents the first three degrees of Freemasonry, known as the blue degrees and also signifies the ruling bloodline. This color is clearly seen throughout Cameron’s work, whether as a writer, director or producer. (sumber disini)
Now, according to Dictionary.com, Avatar means: the descent or embodiment of a deity to the earth in an incarnate form or some manifested shape - the incarnation of a god. This is really what the movie is all about -the projection of the Lucifer spirit into messianic form. The manifestation of the Luciferian spirit, whenever mankind tries to consciously transcend the physical reality with these methods of ascension, enlightenment and evolution, trans-humanism, reincarnation, transmigration of the souls, mind cloning and uploading, the transplantation of cellular memories and singularity. These methods of ascension, transcendence and altered states of consciousness are not part of the Divine Creative mechanism for the ether-body, therefore this will only serve to advance the Luciferian nature. (sumber : The Alien Project)
SUMBER : http://aku-macjay.blogspot.com/
1hwe
Kata Dikota, Janji Ditepati: BONGKAR !!! ANWAR PENGKHIANAT NEGARA YANG SEBENAR...
Kata Dikota, Janji Ditepati: BONGKAR !!! ANWAR PENGKHIANAT NEGARA YANG SEBENAR...: THE I FILES! PENDEDAHAN MENGENAI PENGKHIANAT NEGARA EPISODE 2! Posted by House PK at 3/29/2013 02:00:00 PM 5 comments: ...
Maysian History - Synopsis
Maysian History - Synopsis
Wajah Sebenar Anwar, PKR - Tun Dr Mahathir (Part 1)
1Barisan
Lahad Datu sultanate sulu in sabah- Nur Misuari said 'We had to fight fo...
1Masjid/bmt
Thursday, 28 March 2013
BARISAN NASIONAL (BN): ESSZONE - ZON KESELAMATAN SABAH TIMUR DILANCARKAN...
BARISAN NASIONAL (BN): ESSZONE - ZON KESELAMATAN SABAH TIMUR DILANCARKAN...: EKSKLUSIF !!! ESSZONE KUBURKAN AGENDA ANWAR IBRAHIM CETUS KEGANASAN DI SABAH !!! Pewujudan Zon Keselamatan Sabah Timur (ESSZONE) yang diu...
Pendekar Melayu 2013
Pendekar Melayu 2013
Wednesday, 27 March 2013
BARISAN NASIONAL (BN): TERKINI DARI LAHAD DATU : KONSPIRASI INSIDEN P...
BARISAN NASIONAL (BN): TERKINI DARI LAHAD DATU : KONSPIRASI INSIDEN P...: BREAKING NEWS LAHAD DATU : SMS INDIVIDU PEMBANGKANG MALAYSIA BERJAYA DIKESAN Rabu, Mac 27, 2013 SANGAT MENGEJUTKAN! Rupa...
1technocrate
1technocrate
Tuesday, 26 March 2013
BARISAN NASIONAL (BN): WARTAWAN US DEDAH KOMPLOT ANWAR -ILLUMINATI / ZION...
BARISAN NASIONAL (BN): WARTAWAN US DEDAH KOMPLOT ANWAR -ILLUMINATI / ZION...: PANAS!!!! WARTAWAN ASING DEDAH KOMPLOT ANWAR / AMERIKA. Nile Bowie, wartawan Amerika Syarikat kelahiran NY City, kini bertugas di K...
Pendekar Melayu 2013
Pendekar Melayu 2013
KERIS MELAYU: RAKYAT DIGESA BERI MANDAT KEPADA NAJIB - TUN DAIM...
KERIS MELAYU: RAKYAT DIGESA BERI MANDAT KEPADA NAJIB - TUN DAIM...: ADMIN - TERIMA KASIH DI ATAS PANDANGAN IKHLAS DARIPADA 'MENTERI MENTOR TUN DAIM. BAGI ADMIN KENYATAAN TUN DAIM SEDIKIT SEBANYAK AK...
1hwe
1hwe
Anwar Ibrahim-UMNO MALU TENGOK VIDEO INI!
1technocrate
Thursday, 21 March 2013
THE TECHNOCRATE: Tidak akan benarkan tanahair diceroboh barang sein...
THE TECHNOCRATE: Tidak akan benarkan tanahair diceroboh barang sein...: Najib Ikrar Pertahankan Sabah Selama-lamanya Najib Razak Perdana Menteri, Datuk Seri Najib Tun Razak sekali lagi menegaskan bahawa negeri...
BLOG BN 2013
BLOG BN 2013
LAHAD DATU update MILF CHAIRMAN
Malay Archipelago 1511
ANAKNILAI: LAHAD DATU UPDATES : NUR MISUARI - AL-JAZEERA
ANAKNILAI: LAHAD DATU UPDATES : NUR MISUARI - AL-JAZEERA: Published on Mar 20, 2013 Armed Filipino men are challenging the Malaysian government's power over the province, claiming th...
BLOG BN 2013
BLOG BN 2013
Wednesday, 20 March 2013
Kata Dikota, Janji Ditepati: KANTOI !!! NUR MISUARI BUKAN LAGI PEMIMPIN MNLF !!...
Kata Dikota, Janji Ditepati: KANTOI !!! NUR MISUARI BUKAN LAGI PEMIMPIN MNLF !!...: INTERNATIONAL BREAKING NEWS!!!!! MISUARI IS NOT MNLF LEADER ANYMORE !!!!! Sebuah laporan media antarabangsa melaporkan bahawa kini misuari t...
Malay Archipelago 1511
Malay Archipelago 1511
PENDEKAR MELAYU: Jangan percaya dengan tawaran gencatan senjata Jam...
PENDEKAR MELAYU: Jangan percaya dengan tawaran gencatan senjata Jam...: Gencatan senjata: Jangan percaya Sultan Sulu, kata Zahid Hamidi SHAH ALAM - "Jangan percaya dengan tawaran gencatan senjata ...
BLOG BN 2013
BLOG BN 2013
BARISAN NASIONAL (BN): TERKINI !!! 8 SUSPEK RAKYAT FILIPINA DIDAKWA LANC...
BARISAN NASIONAL (BN): TERKINI !!! 8 SUSPEK RAKYAT FILIPINA DIDAKWA LANC...: WEDNESDAY, 20 MARCH 20 UTUSAN MALAYSIA 19/03/2013 Terkini : 8 suspek rakyat Filipina didakwa lancar perang terhadap Ya...
1Masjid/bmt
1Masjid/bmt
LAHAD DATU Sulu army set for long war
Pendekar Melayu 2013
Ebenaezer-Sleep My Dear Friend(2013 Lahad Datu Standoff Tribute)
1Masjid/bmt
Tuesday, 19 March 2013
ANAKNILAI: Anwar Gelabah !!!! Dahh.....Jawab Ya Je...Abis Cer...
ANAKNILAI: Anwar Gelabah !!!! Dahh.....Jawab Ya Je...Abis Cer...: VIDEO: ANWAR TERKELU! ‘ARE U GAY’? YES OR NO PUN,GELABAH NAK JAWAB!! Puas si Raja Goyang bersilat lidah bila ditanya adakah dia seor...
Pendekar Melayu 2013
Pendekar Melayu 2013
BARISAN NASIONAL (BN): TERKINI !!! LAPURAN SEMASA DARI LAHAD DATU, SABAH,...
BARISAN NASIONAL (BN): TERKINI !!! LAPURAN SEMASA DARI LAHAD DATU, SABAH,...: BREAKING NEWS!!!! SIDANG MEDIA TERKINI LAHAD DATU !!!!! Jam 1130 Kenyataan oleh Pesuruhjaya Polis Sabah, Dato' Hamza Taib : ...
1Masjid/bmt
1Masjid/bmt
TAKKAN MENYERAH KALAH(Tribute For PDRM & ATM - OPS DAULAT)
Pendekar Melayu 2013
BARISAN NASIONAL (BN): TERKINI !!! : Pasukan Keselamatan Sedia Tentang H...
BARISAN NASIONAL (BN): TERKINI !!! : Pasukan Keselamatan Sedia Tentang H...: Pasukan Keselamatan Sedia Tentang Habis-habisan Pengganas Sulu LAHAD DATU, 18 Mac – Pasukan keselamatan akan terus me...
Maysian History - Synopsis
Maysian History - Synopsis
PENDEKAR MELAYU: PM BIDAS PAS PERTIKAI SOAL MATI SYAHID PERWIRA NEG...
PENDEKAR MELAYU: PM BIDAS PAS PERTIKAI SOAL MATI SYAHID PERWIRA NEG...: Pas Dibidas Hingga Soal Mati Syahid Pun Dijadikan Bahan Politik PUTRAJAYA, 18 Mac - Perdana Menteri Datuk Seri Najib Tun Razak hari ini...
Suara Nusantara Suara Hati Anda
Suara Nusantara Suara Hati Anda
Monday, 18 March 2013
Kerajaan Tidak Kompromi Berhubung Isu Keselamatan - Hishammuddin 16/2/2013
Maysian History - Synopsis
PENDEKAR MELAYU: Malaysia Armed Enforcement - Always prepared and c...
PENDEKAR MELAYU: Malaysia Armed Enforcement - Always prepared and c...: Pendekar Melayu 2013
Suara Nusantara Suara Hati Anda
Suara Nusantara Suara Hati Anda
Sunday, 17 March 2013
BARISAN NASIONAL (BN): OPS DAULAT - LATEST UPDATES !!! THE SABAH INTRUS...
BARISAN NASIONAL (BN): OPS DAULAT - LATEST UPDATES !!! THE SABAH INTRUS...: Sumpah Ba'iah Demi Agama, Bangsa dan Negara Lapuran Terkini Mingguan Malaysia 17 /03/ 2013 Dr. Mahathir mencadangkan penub...
Maysian History - Synopsis
Maysian History - Synopsis
PENDEKAR MELAYU: TERKINI UPDATES : OPS DAULAT DITUMPUKAN KEPADA K...
PENDEKAR MELAYU: TERKINI UPDATES : OPS DAULAT DITUMPUKAN KEPADA K...: Terkini Isu Lahad Datu : Operasi Daulat Diteruskan OPERASI DAULAT DITERUSKAN SEHINGGA ZON MERAH BERSIH DARIPADA PENGGANAS Gambar...
Suara Nusantara Suara Hati Anda
Suara Nusantara Suara Hati Anda
tERKINI !! BAKI 50 ORANG PENGGANAS DIBURU SAMPAI LUBANG CACING.......!!
TERKINI ! 50 PENGGANAS SULU TERUS DIBURU TENTERA DI LAHAD DATU, SABAH
Operasi Daulat untuk memburu saki baki pengganas militan yang menceroboh Lahad Datu sejak 12 Februari lepas akan diteruskan sehingga semua kawasan di daerah berkenaan bersih daripada penceroboh dari selatan Filipina itu.
Yakin operasi itu boleh diselesaikan dalam masa terdekat, pasukan keselamatan percaya kini hanya tinggal sekitar 50 orang lagi saki baki kumpulan militan di kawasan berkenaan.
Anggaran bilangan musuh itu dibuat berdasarkan jumlah yang ditembak mati, ditahan dan lari ke selatan Filipina.
"Kami akan cuba selesaikan secepat mungkin," kata Pesuruhjaya Polis Sabah Datuk Hamza Taib sambil menegaskan bahawa pasukan keselamatan tidak meletak 'garis masa' untuk operasi itu.
Selepas 12 hari Operasi Daulat, Kampung Tanduo yang sebelum ini menjadi kubu kumpulan penceroboh kini bersih daripada pengganas, dan pasukan keselamatan percaya usaha membersih Kampung Tanjung Batu akan dapat diselesaikan pada Ahad.
Hamza berkata penduduk kampung terlibat akan dibenar pulang selepas pasukan keselamatan membersihkan kawasan itu daripada jerangkap samar dan pelbagai ancaman lain serta berbincang dengan ketua masyarakat.
"Kami akan letak anggota keselamatan untuk pastikan tiada musuh dapat kembali semula ke kampung berkenaan," katanya.
Dalam tempoh 72 jam sehingga 5 petang ini, tiada pertempuran antara pasukan keselamatan dan penceroboh militan.
Pasukan keselamatan melancarkan serangan ofensif terhadap kumpulan militan dari Sulu pada 5 Mac selepas beberapa siri rundingan dengan kumpulan yang menceroboh pesisir pantai Lahad Datu sejak 12 Februari lepas, gagal.
Dalam tempoh itu, 61 musuh ditembak mati dan 27 daripada mayat pengganas telah dibawa keluar dari zon merah manakala 104 ditahan kerana disyaki mempunyai kaitan dengan kumpulan pengganas, dan 232 ditahan kerana berada di kawasan larangan.
Sembilan anggota keselamatan terdiri daripada lapan anggota polis dan seorang tentera terkorban dalam pertempuran dengan kumpulan pengganas itu.
Seorang lagi anggota tentera terkorban dalam kemalangan jalan raya melibatkan trak tentera yang dalam konvoi untuk Operasi Daulat. BERNAMA
sumber
1hwe
Labels:
Azzamuddin Kiram lll,
Lahad datu,
OP DAULAT,
Pengganas Sulu,
Sabah
Location:
Sabah, Malaysia
1Malaysia 1World: Freemason in Penang ??? Just Read !!!
1Malaysia 1World: Freemason in Penang ??? Just Read !!!: CHAPTER 14 - PENANG, PEARL OF THE ORIENT Since Chapter 13 was posted in September last year, I have stopped writing my 'Jerejak' nov...
One Mosque
One Mosque
Saturday, 16 March 2013
Wednesday, 2 January 2013
AFTERDARK WRITES!: YOUTUBE: BRAINWASHED TO KILL
AFTERDARK WRITES!: YOUTUBE: BRAINWASHED TO KILL: I saw this documentary in Astro and this is AMAZING! Contrary to what Adam and Jamie said in "Mythbusters", a person can be brainwashed to...
Tuesday, 1 January 2013
1Malaysia 1World: Kurang Ajar - Bendera Haram Berkibar di Kuala Lump...
1Malaysia 1World: Kurang Ajar - Bendera Haram Berkibar di Kuala Lump...: Sang Saka Malaya berkibar lagi di Dataran Bendera kontroversi Sang Saka Malaya dikibarkan sekali lagi pada malam ambang tahun b...
Pecah Palak Mikir: Video Vendetta Menyerang Berita TV9 Mengkhiati Anw...
Pecah Palak Mikir: Video Vendetta Menyerang Berita TV9 Mengkhiati Anw...: Inilah simbol yang menyokong Mahasewel yang menyewel bukan? tetapi aduhai kenapa mengkhianati Anwar ibrahim pula hahhaah kasi layan beb!...
Subscribe to:
Posts (Atom)